CHAPTER 355
TOWN AND COUNTRY PLANNING ACT

[SUBSIDIARY LEGISLATION]

INDEX TO SUBSIDIARY LEGISLATION

   NOTICES

      The Town and Country Planning (Application of Third Schedule) Notice

      The Dodoma General Planning Scheme (Approval, Deposit and Commencement) Notice

      The Constitution of a Special Committee (Area Planning Committee) for Dodoma Capital Area

      The Town and Country Planning (Nyalikungu Master Plan) Deposit Notice

      The Town and Country Planning (Master Plan Areas) Notice

      Omitted Notices

   ORDERS

      The Town and Country Planning Areas Order

      The Town Development (Control) (Application) Order

      The Town and Country Planning (Planning Areas) Order

      The Town and Country Planning (Musoma Township Planning Areas) Order

      The Town and Country Planning (Planning Areas) Order (1993)

      The Town and Country Planning (Areas Ripe for Development) Order

      The Town and Country Planning (Public Beaches Planning Area) Order

      The Town and Country Planning (Dar es Salaam Master Plan Area) Order

      The Town and Country Planning (Dar es Salaam Land Re-distribution) Order

      The Town and Country Planning (Songea Central Area Re-development Scheme) Order

      The Town and Country Planning (Planning Areas) Order (1996)

      The Town and Country Planning (Hanang District Planning Areas) Order

      The Town and Country Planning (Mererani Planning Area) Order

   REGULATIONS

      The Area Planning Committee (Dodoma Capital Development Area) Constitution, Proceedings and Delegation of Functions Regulations

      The Town and Country Planning (Appeals) Regulations

      The Town and Country Planning (Constitution and Proceedings of Joint Area Planning Committees) Regulations

      The Town and Country Planning (Use Classes) Regulations

      The Town and Country Planning (Application for Planning Consent) Regulations

      The Town and Country Planning (Modifications of Planning Schemes) Regulations

      The Town and Country Planning (Development and Zoning) (Capital Development Area) Regulations

      The Town and Country Planning (Town Planning Space Standards) Regulations

      The Town and Country Planning (Urban Farming) Regulations

NOTICES

THE TOWN AND COUNTRY PLANNING (APPLICATION OF THIRD SCHEDULE) NOTICE

(Section 27)

G.N. No. 133 of 1960

   1. This Notice may be cited as the Town and Country Planning (Application of Third Schedule) Notice.

   2. It is hereby declared that the provisions of the Third Schedule to the Town and Country Planning Act shall apply on the first day of May, 1960, to the areas of land described in the Schedule hereto in the preparation of a detailed scheme.

SCHEDULE

   All those areas of land edged in red on Drawings Nos. 1/268/358 and 1/257/957 held by the Commissioner for Town Planning.

   Note. – The effect of this Notice is to apply the Third Schedule of the Town and Country Planning Act to part of the Kisutu and Kurasini areas of Dar-es-Salaam.

THE DODOMA GENERAL PLANNING SCHEME (APPROVAL, DEPOSIT AND COMMENCEMENT) NOTICE

(Sections 33 and 34)

G.N. No. 141 of 1979

   1. This Notice may be cited as the Dodoma General Planning Scheme (Approval, Deposit and Commencement) Notice.

   2. The Dodoma General Planning Scheme entitled "The National Capital Master Plan", having been approved without any modification, shall be deposited at the headquarters of the Ministry of Capital Development in Dodoma and copies of it shall be deposited, one each, at the head quarters of the Ministry of Lands, Housing and Urban Development in Dar-es-Salaam and at the offices of the Capital Development Authority in Dodoma and in Dar-es-Salaam.

   3. Any person may, subject to the provisions of any written law for the time being in force in that behalf, inspect the scheme at any of the places in which it is deposited.

   4. It is hereby notified that upon the expiry of seven days from the date of the publication of this Notice in the Gazette, the Dodoma General Planning Scheme entitled "The National Capital Master Plan" shall come into force and all development within the Dodoma Capital Development Area shall comply with that Scheme.

THE CONSTITUTION OF A SPECIAL COMMITTEE (AREA PLANNING COMMITTEE) FOR DODOMA CAPITAL AREA

(Regulation 3 of the Area Planning Committee (Dodoma Capital Development Area) (Constitution, Proceedings and Delegation of Functions) Regulations

G.N. No. 2 of 1979

   1. Notice is hereby given to the effect that in pursuance of the provisions of Regulation 3 of the Area Planning Committee (Dodoma Capital Development Area) (Constitution, Proceedings and Delegation of Functions) Regulations *, the following have been appointed to constitute the Special Committee (Area Planning Committee) for the Dodoma Capital Area:

Chairman:

   Permanent Secretary, Ministry of Capital Development.

Members:

   1. Director of Planning and Land Management - Capital Development Authority.

   2. Director of Architecture and Housing - Capital Development Authority.

   3. Director of Horticulture and Conservation - Capital Development Authority.

   4. Director of Engineering and Construction - Capital Development Authority.

   5. Corporation Secretary - Capital Development Authority.

   6. Town Director - Dodoma.

   7. Regional Land Development Officer, Dodoma.

   8. Chairman, Dodoma Town Council.

   9. Ndugu JOHN FUNGO, Councillor - Dodoma Township.

   10. Director of Land Administration - Ministry of Capital Development.

   2. [Revokes the Appointments to the Special Committee made in 1976 under the Transfer of Powers and Duties (Town and Country Planning) (Dodoma) Order *].

THE TOWN AND COUNTRY PLANNING (NYALIKUNGU MASTER PLAN) DEPOSIT NOTICE

(Section 29)

G.N. No. 287 of 1993

   1. This Notice may be cited as the Town and Country Planning (Nyalikungu Master Plan) Deposit Notice.

   2. Notice is hereby given that the Master Plan Scheme prepared for Nyalikungu by the Capital Development Authority is deposited at the District Executive Director's Office in Maswa, and at the Director of Urban Development, Ardhi House.

   3. Any Person or body of persons can inspect and make objection in writing to the Director-General, C.D.A., P.O. Box 913, Dodoma within two months after publication of this notice in the Government Gazette.

   Copies of the said scheme may be obtained from the above-mentioned offices.

THE TOWN AND COUNTRY PLANNING (MASTER PLAN AREAS) NOTICE

(Section 33)

G.Ns. Nos.
177 of 1996
178 of 1996
179 of 1996
180 of 1996
182 of 1996
183 of 1996

   1. This Notice may be cited as the Town and Country Planning (Mwanza Master Plan Area, Musoma Master Plan Area, Nyalikungu Master Plan Area, KIA Master Plan Area and Songea Master Plan Area) Notice.

   2. The areas described in the Schedule hereto are hereby declared to have a Master Plan for the purpose of the Town and Country Planning Act.

SCHEDULE

Mwanza

   All that area of land and water outlined in the Mwanza Master Plan prepared by the Ministry of Lands, Housing and Urban Development in 1992 held by the Director of Urban Development and the Mwanza Municipal Director has a Master Plan in force.

Makambako

   All that area of land and water outlined in the Makambako Master Plan area prepared by Ardhi Institute in 1990 held by the Director of Urban Development and the Njombe District Executive Director has a Master Plan in force.

Musoma

   All that area of land and water outlined in the Musoma Master Plan prepared by the Ministry of Lands, Housing and Urban Development in 1991 held by the Director of Urban Development and the Musoma Town Director has a Master Plan in force.

Nyalikungu

   All that area of land and water outlined in the Nyalikungu Master Plan prepared by the capital Development Authority in 1990 held by the Director of Urban Development and the Maswa District Executive Director has a Master Plan in force.

KIA

   All that area of land and water outlined in the Kia Master Plan prepared by the Ministry of Lands, Housing and Urban Development in 1991, held by the Director of Urban Development and the District Executive Director of Hai and Arumeru Director has a Master Plan in force.

Songea

   All that area of land and water outlined in the Songea Master Plan area prepared by the Ardhi Institute in 1990 held by the Director of Urban Development and Songea Town Director has a Master Plan in force.

OMITTED NOTICES

   The following Notices are hereby omitted:

G.N. No. 125 of 1978

Sheria ya Uongozi wa Hospitali za Watu Binafsi ya Mwaka 1977: tarehe ya kuanza kutumika.

G.N. No. 142 of 1979

The Dodoma General Planning Scheme (Certificate of Approval) Notice, 1979.

G.N. No. 123 of 1980

The Dodoma Detailed Planning Scheme for Zuzu Industrial estate (Deposit) Notice, 1980.

G.N. No. 124 of 1980

The Dodoma Detailed Planning Scheme for Central Business Park (Deposit) Notice, 1980.

G.N. No. 125 of 1980

The Dodoma Detailed Planning Scheme for Western Industrial Area (Deposit) Notice, 1980

G.N. No. 126 of 1980

The Dodoma Detailed Planning Scheme for Area "A" (Deposit) Notice, 1980.

G.N. No. 127 of 1980

The Dodoma Detailed Planning Scheme for area "B" (Deposit) Notice, 1980.

G.N. No. 128 of 1980

The Dodoma Detailed Planning Scheme for Area "C" (Deposit) Notice, 1980.

G.N. No. 57 of 1986

The Dodoma detailed Planning Schemes (Deposit) Notice, 1986

G.N. No. 13 of 1990

The Amending Scheme to the Dodoma General Planning Scheme (Deposit) Notice, 1900.

G.N. No. 384 of 1992

The Town and Country Planning (Songea Makambako, Musoma and KIA Master Plans (Deposit) Notice, 1992.

G.N. No. 287 of 1993

The Town and Country Planning (Nyalikungu Master Plan) (Deposit) Notice, 1993.

ORDERS

THE TOWN AND COUNTRY PLANNING AREAS ORDER

(Section 13)

   1. This Order may be cited as the Town and Country Planning Areas Order.

   2. Each of the areas described in the Schedule hereto is hereby declared to be a planning area for the purposes of the Town and Country Planning Act.

SCHEDULE

   (1) All that area of land and water coloured green and outlined in red on Map No. TCP/1/1/957 held by the Commissioner for Town Planning *.

   (2) All that area of land coloured green and yellow and outlined in purple on Map No. TCP/10/1/957 held by the Commissioner for Town Planning *.

   (3) All that area of land and water coloured pink and yellow and outlined in purple on Map No. TCP/2/1/957 held by the Commissioner for Town Planning *.

   (4) All that area of land and water coloured and hatched green and outlined in red on Map No. TCP/14/1/957 held by the Commissioner for Town Planning *.

   (5) All that area of land and water edged pink on Drg. No. 1/452/566 comprising the whole of Dar es Salaam City Council Area, and part of Mzizima District Council Area *.

   (6) All that area of land shown edged green on Map No. TCP. 8/1/1157, held by the Commissioner for Town Planning *.

   (7) All that area of land and water edged green on Map. No. TCP. 7/1/957, held by the Commissioner for Town Planning *.

   (8) All that area of land shown edged green on Map. No. TPC. 8/1/1157, held by the Commissioner for Town Planning *.

   (9) All that area of land outlined in red on Map No. TCP/7/2/152, held by the Commissioner for Town Planning *.

   (10) All that area of land in Arusha outlined in the Urban Areas (Declaration of Boundaries) Order, 1978 [G.N. No. 97 of 1978], held by the Municipal Director *.

   (11) All that area of land in Tabora outlined in the Urban Areas (Declaration of Boundaries) Order, 1978, held by Town Director *.

   (12) All that area of land in Mwanza outlined in the Local Authorities (Division into Wards) Order, 1983 [G.N. 91 of 1983] amended *.

   (13) All that area of land in Morogoro outlined in the Urban Areas (Declaration of Boundaries) Order, 1978, held by Town Director *.

   (14) RegionTown Planning Area.
   TangaLushoto.
Mombo.
Muheza.
Korogwe.
Pangani.
Handeni *.
   MbeyaVwawa.
Tukuyu.
Kyela.
Tunduma.
Itumba.
Chunya *.
   SingidaManyoni.
Itigi.
Kiomboi.
Singida *.
   LindiKilwa Masoko.
Liwale.
Nachingwea.
Lindi *.
   ShinyangaBariadi.
Kahama.
Shinyanga.
Maswa.
Meatu *.
   KageraKaragwe.
Ngara.
Bukoba.
Muleba.
Biharamulo *.
   KilimanjaroHai.
Rombo-Mkuu.
Same.
Mwanga *.
   MaraBunda.
Tarime.
Kibara.
Mugumu.
Musoma.
Shirati *.
   IringaNjombe.
Iringa.
Makambako.
Makete.
Rudewa.
Mafinga *.
   MtwaraTandahimba.
Newala.
Masasi.
Mtwara *.
   MorogoroMang'ula.
Kilombero.
Kilosa.
Mkamba-Ruaha.
Mahenge.
Ifakara *.
   PwaniChalinze.
Kibaha.
Kisarawe.
Bagamoyo.
Utete *.
   TaboraIgunga.
Urambo.
Nzega *.
   RuvumaNamtumbo.
Mbinga.
Tunduru.
Songea *.
   SumbawangaMpuyi.
Mpanda.
Sumbawanga.
Namanyere *.
   MwanzaNgudu.
Murutunguru.
Nansio.
Geita.
Misungwi.
Magu.
Sengerema.
Malya *.
   ArushaKibaya.
Karatu.
Mbulu.
Monduli.
Namanga.
Babati *.
   DodomaKwamtoro.
Mpwapwa.
Kondoa *.
   KigomaKasulu.
Kibondo.
Kigoma-Ujiji *.

   (15) All that area of Land in Dodoma shown on Map No. RW. 9/75 which is held in Dodoma by the Permanent Secretary to the Ministry of Capital Development, and copies of which are held by the Ministry of Lands, Housing and Urban Development on Dar es Salaam, and by the Capital Development Authority at its offices in Dodoma and in Dar es Salaam *.

   (16) All that area of Land in Arusha outlined in the Urban Areas (Declaration of Boundaries) Order, G.N. No. 97 of 1978, held by Municipal Director *.

   (17) All that area of Land in Tabora outlined on the Urban Areas (Declaration of Boundaries) Order G.N. No. 97 of 1978, held by Town Director *.

   Hai Planning Area Boundary:

   (18) Commencing at the junction of the Sanya river and the Moshi-Arusha Southern railway reserve belt; thence along the eastern bank of the Sanya river in a north-easterly direction for seven kilometres; thence due east in a straight line to a point on the western bank of Ngore Koe (Kware) river; thence along the western bank of the river in a south-easterly direction to the junction of the Ngore Koe river with the Moshi-Arusha southern railway reserve belt; thence along the Sanya river and the Moshi-Arusha southern reserve belt the point of commencement *.

   Explanatory Note

   (This Note is not part of the Order but is intended to indicate the general purpose).

   The effect of this order is to make Hai Urban Area mentioned in the Schedule a Planning Area. Planning Consent for all development (Building and Civil Engineering Works, change of use of land or building etc.) must be obtained from the Director of Town Planning or Regional Town Planner in accordance with section 35 of Cap. 355. Application for Planning consent must be in accordance with Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (19) All that land which is under Sanya Plains which is defined as land that lies between Kware River (south of Moshi - Arusha Highway) and Sanya River (north of the highway) to the east and Kikuletwa River to the South. Majengo village, Matuga Crater and the eastern boundary of Meru forest reserve marks the western boundary. Northern village boundaries of King'ori, Naibilie and Oldonyo Muruwa form the northern boundary of the Sanya Plains. The Sanya Plains, therefore, lies between longitudes 36°5' and 37°13' and 3°30' south of the Equator *.

   Explanatory Note

   (This note is not part of the Order but is intended to indicate its general purpose). The effect of this Order is to make the Sanya Plains a Planning Area. The Planning Area Committee will be the Hia District Council and Arumeru District Council and consent for developments (building and civil engineering works, use of land and buildings etc.), must be obtained from the Area Planning Committees in accordance with section 35 of Cap. 355. Applications for such consent must be made in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (20) Mbezi Juu, Kunduchi/Mtongani, Radio Tanzania-Kunduchi, Tegeta, Ununio, Boko-Maji, Basi-haya, Wazo hili, Mabibo, Segera, Tabata/Kimanga, Kitunda, Yombo-Vituka, Mtoni Kijichi, Kidete, Kigamboni and Kibonde Maji-Mbagala *.

   (21) All that area of land being the area of the Arusha Town Council, as shown on registered Plan No. 13055 (Survey D5">31/5) deposited with the Survey Division of the Ministry of Lands, Settlement and Water Development, and described in the First Schedule of the Local Government (Arusha Town Council) Amending Instrument, 1965 *.

   Explanatory Note

   (This note is not part of the Order but is intended to explain its general purpose)

   The effect of this order is to make the Arusha Town Council area a Planning Area. The Area Planning Committee will be the Arusha Town Council and consent for all development (sub-division of land, erection of buildings structures, change of use of land and buildings, etc.) must be obtained, in accordance with section 35 of Cap. 355 from the Area Planning Committee. Applications for such consent must be made in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (22) All that area of land in Mbeya outlined in red on Map No.TP/23/144/174, held by the Director of Urban Planning *.

   Explanatory Note

   (This Note is not part of the Order but is intended to indicate its general purpose).

   The effect of this order is to make the extended Mbeya Township a Planning Area. The Planning Area Authority will be the Mbeya Sub-district Development Council and consent for all development (building and civil engineering works, change of use of land and buildings, etc.) must be obtained from the Area Planning Committee, in accordance with section 35 of Cap. 355. Applications for such consent must be made in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (23) All that area of land, in Katesh Planning Area covering about 18 square kilometres, bounded to the north by Sora Hill and Udamaschek Hill, to the east by Jorodom Hill, Lamay Hill and Kaharo Hill, to the south by Dumbeta Hill and Kijenga Hill, and by Darajani Hill to the west *.

   (24) All that piece of land of Usa River Planning Area covering about 13.8 sq. km. bounded by the Moshi-Arusha railway line to the south commencing at the bridge on Usa River then northwards along Usa River up to the bridge on Old Moshi road then northwards along Momella road for a distance of about 1.6km then southwesterly straight to the bridge on new Moshi road on Mbembe River then south-easterly following Mbembe River to the bridge on Moshi Arusha Railway line then along the railway line easterly up to the bridge on Usa River the point of commencement *.

Holili Planning Area Boundary:

   (25) All that area of land covering about 7.8. square kilometre. Commencing at the bridge on the junction of river Matamba and Himo/Taveta road, hence east-south direction Njoro hill for about 2.1 kilometres, hence north-east direction to Morio river for about 0.75 kilometre, hence south-west direction along the bank of the Morio river for about 1.1. kilometres; hence south-west direction in a straight line for about 3.75 kilometres in a point at Lacima hill; hence north-west direction for about 7.15 kilometres to the bridge the point of commencement *.

Tarakea Planning Area Boundary:

   (26) All that area of land covering about 3.7 square kilometres. Commencing at a point on the road to Oloitokitoki towards south-east direction for about 2.35 kilometres on a point on the Lower Rombo road; hence south-west direction for about 1.87 kilometres, hence north-west direction for about 2.6 kilometres) hence east-north direction for about 1.35 kilometres to the point of commencement *.

   (27) All that area of land, in Kakonko Planning Area covering about 23.03 square Kilometres, bounded to the north by Mbizi hills including Muganza Settlement, to the east by Muhwazi river, to the south by Kikongozi hills including Itumbiko Settlement and by Kiziguzigu hills and Kumvumbu river to the west *.

   (28) All that area of land, in Mabamba Planning Area covering about 33.4 Square Kilometres, bounded by Ruguye and Malagarasi river to the east by international boundary with Burundi to the north the slopes of Mabamba hills to the west excluding Nyakasanda village and the boundary with Nyabitaka village to the south *.

   (29) All that area of land, in Mnanila Planning Area covering about 18.7 Square Kilometres, bounded by the international boundary with Burundi to the west, Nyakimwe hills and along Mnanila/Mwayaya road to the south, to the east by Mwayaya. Mkatanga and Musagara villages and to the north by the international boundary with Burundi *.

   (30) All that area of land in Morogoro Planning Area outlined in Registered Plan No. 17380, held by the Director of Urban Planning *.

   Explanatory Note

   (This Note is not part of the Order but is intended to indicate its general purpose)

   The effect of this Order is to make the extended Morogoro Township a Planning Area. The Planning Area Authority will be the Morogoro Sub-District Development Council and consent for all development (building and civil engineering works, change of use of land and buildings, etc.) must be obtained from the Area Planning Committee, in accordance with Section 35 of Cap. 355. Applications for such consent must be made in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

31. RegionDistrictVillageDrawing Number ARUSHAHANANGMeaskron
Mara
Getaghul
Nangwa
Basotughat
Gisambalang
Dirima
Wareta
Balangdalalula54/QR/101/1289
54/AR/103/1289
54/AR/103/1289
54/AR/110/590
54/AR/104/1289
54/AR/108/590
54/AR/107/590
54/AR/106/590
54/AR/109/590 *
32.BABATIEndabeck
Himiti
Riroda
Sigino
Managhar
Endakiso54/AR/203/390
54/AR/201/390
54/AR/205/390
54/AR/205/390
54/AR/202/390
54/AR/206/390 *
33. DODOMADODOMA RURALChamwino
Vikonje
Buigiri
Manyali
Mahawa
Msanga
Kawawa
Nzali
Chinangali I
Chinangali II
Chahwa
Ndebwe
Ilole
Mvumi Makulu
Mvuni Mission
Handali
Muungano
Ngahelezi54/DO/14/686
54/DO/15/687
54/DO/19/888
54/DO/20/688
54/DO/17/288
54/DO/18/389
54/DO/23/689
54/DO/25/689
54/DO/21/389
54/DO/22/689
54/DO/24/689
54/DO/44/0490
54/DO/46/0490
54/DO/28/0888
54/DO/45/0490
54/DO/49/0490
54/DO/47/0490
54/DO/48/0490 *
34.KONDOAHaubi
Mafai
Ntomoko
Kalamba54/DO/06/1019
54/DO/42/0390
54/DO/40/0390
54/DO/41/0290 *
35. TANGAHANDENIKimbe Old
Kimbe New
Segera
Masatu54/TA/23/489
54/TA/23/489
54/TA/21/1168
54/TA/19/888 *
36. IRINGAMAKETENgoje
Matamba
Mbela
Mlondwe
Kinyika
Ndapo
Nungu
Nyanzwa54/05 "and" /289
54/05 "and" /389
54/020/589
54/0IB/187
54/06B/489
54/06B/489
54/06B/489
54/05B/11688 *
37.MUFINDIIgowole
Kipanduka
Image
Mahanji
Ibaku
Rugembwa
Ilandutwa
Lugenge
Kitelewasi
Muwimbi
Udumka54/OIB/586
54/8B/0190
54/7B/1189
54/04B/689
54/02B/0689
54/02B/0689
54/03B/587
54/0IB/1287
54/05A/0787
54/0IB/687
54/04B/1088 *
38. MOROGOROKILOMBEROKiswago
Rubeho
Sanje
Sonjo
Katulukila
Kiberege
IchondeMISC/MG/6/689
MISC/MG/7/689
MISC/MG/9/689
MISC/MG/.....
MISC/MG/3/689
MISC/MG/2/689
MISC/MG/5/689 *

   Explanatory Note

   (This note is not part of the Order but it is intended to indicate its general purpose)

   The effect of this Order is to make the villages mentioned in the Schedule as Planning Areas. Planning consent for all development (Building and Civil Engineering Works, Change of Use of Land and building etc.) must be obtained from the Director of Urban Development or respective Regional Town Planning Officers in accordance with section 35 of Cap. 355.

   Application for Planning consent must be sent to the respective District Council in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (39) All that area of land, in Uvinza Planning Area covering about 14.02 Square Kilometres, bounded to the south by Kasozi Nyanza hills, Malagalasi river to the west including Mkwaza solar salt plant by Nkwanza hills to the west, by Ruchugi river and Chakulu road to mines plant to the east and back to Kasonza Nyanza Hills *.

   (40) The whole of the Sumbawanga Master Plan Area *.

   Explanatory Note

   (This Note is not part of the Order but is intended to indicate its general purpose)

   The effect of this Order is to make the area covered by the Sumbawanga Master Plan to be a Planning Area. The Planning Area Authority shall be the Sumbawanga Town Council and consent for all development (building and engineering works, change of use of land, building etc.) must be obtained from the Area Planning Committee in accordance with section 35 of Cap. 355

   Application for the consent must be made in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

RegionDistrictVillageApproved TP. Drawing No. 41. DodomaKondoaKingale Juu
Baura
Loo
Bahi54/DO/52/0591
54/DO/53/0691
54/DO/51/0591
48/DO/01/688 *
42. ArushaHanangBarjament
Gitting
Endasack
Endasiweld
Endagawe
Mureru54/AR/1105/791
54/AR/1104/791
54/AR/1104/791
54/AR/1101/791
54/AR/1102/791
54/AR/110/590 *
43. MaraMusomaButiama
Nyantira
Kisorya
Gusuhi
Nyakahende54/45/375
54/43/272
54/68/672
54/41/172
VU/5/571 *
44. Ruvuma Songea RuralKilimasera
Nambecha
Mchamoro
Kitanda
Likuyu-Se-
Kanamanganga52/RU/20/1091
52/RU/21/1091
52/RU/21/1091
52/RU/19/1091

52/RU/18/1091 *
45. RukwaSumbawangaSongambele-
Azimio
Musanda-
Muungano
Mumba
Jangwani
Sandulula
60/01/191

60/02/291
60/04/591
60/04/591
60/05/591 *
46. ShinyangaKahamaKisuke
Mpera54/11/968
54/11/968 *
47. KigomaKibondoMahembe
NyarongaVUKG/16/672
VUKIB/50/572 *
48. TangaHandeniMaili-Kumi
Mlale54/TA-19/888
Misc. 13/1063
49. PwaniBagamoyoKongo-Yombo54/72/173 * 50. MtwaraMtwara RuralMkungu54/MT/07/591 * 51. IringaMaketeIgwachanya
Usuka
Dulamu
Lugoda
Luganga
Lugemba
Naitulavamu
Ilambiele-
Matembo54/02B/1289
54/02B/1289
54/02B/1289
54/02B/1289
54/7B/1189
54/7B/1189
54/7B/0591

54/7B/0591 *
Iringa RuralMseke-Isimani
Kitenda52/61/572
Misc./11/763
52. LindiLindi RuralMtuaTP/54/LD/01/0490 * 53. MorogoroUlangaKipenyo
Itete-Njiwa
Itete Minazini
Madoto
Chanzulu
Mbwede
Mbuyuni
Mvumi
Msowero
Mamoyo
Ilonga
Gongoni
Batini
Paya-PeyaMisc/MG/11/1090
Misc/MG/12/1090
Misc/MG/12/1090
Misc/MG/13/1090
Misc/MG/14/1090
Misc/MG/15/1090
Misc/MG/16/1090
Misc/MG/18/1090
Misc/MG/18/1090
Misc/MG/19/1090
Misc/MG/20/1090
Misc/MG/21/1090
Misc/MG/23/1090
Misc/MG/23/1090 *

   Explanatory Note *

   (This note is not part of the Order but it is intended to indicate its general purpose).

   The effect of this Order is to make the villages mentioned in the Schedule as Planning Areas. Planning consent for all development (Building and Civil Engineering Works, change of the use of land and buildings, etc.) must be obtained from the Director of Urban Development or respective Regional Town Planning Officers in accordance with section 35 of Cap. 355. Application for Planning consent must be sent to the respective District Council in accordance with the Town and Country Planning (Application for Planning Consent) Regulations, 1960.

   (54) All that land, in Lituhi Planning area which extends in the northern part to the bank of river Ruhuhu, in the eastern part to river Likali, in the southern part to Ndumbine village and in the western part to the bank of Lake Nyasa *.

   (55) All that area of land, in Hedaru Planning Area covering about 2.06 square kilometres; bounded to the north by a three used for performing rituals, from here the boundary extends eastwards and westwards for about ½ kilometre in each direction, to the south by a tree known as "Mramba wa Mpako" on the main road and extends west and Eastwards for about half a kilometre in each direction; to the west by a power line *.

   (56) Kisiwani Planning Area boundary *.

   All that area of land covering about 7.31 square kilometres–

North:the boundary passes through Mozimbo bridge on Mozimbo Valley and extends Eastwards 500 metres and Westwards 500 metres from the bridge.
East:The boundary passes on this side is a furrow or rather a channel used for irrigation, past Makombo river southward to Bama village.
South:The boundary stretches from Bama village through Mkondo and passes on the slopes of Bama hill.
West:From Mkondo the boundary extends to Dimisas hills then Northwards past Makombo river to Mvureni Primary School and further past Forest Reserve to Mozimbo Valley.

   (57) Gonja-Maore Planning Area boundary *.

   All that area of land covering about 52 square kilometres. Commencing at the bridge to westerly direction along the road for about 500 metres; hence north-westerly direction for about 400 metres; thence east-north direction along Chongweni forest on the slopes of Ndololi mountains for about 2.4. kilometres; thence east-north direction for about 300 metres on the slopes of Kwambegu hills; thence southward for about 500 metres along the slopes of Kwambegu hills; hence easterly direction for about 400 metres; hence northwards direction on the same slopes for about 400 metres; thence easterly direction for about 200 metres to the road; thence south direction for about 250 metres along the road to the bridge; thence straight east direction for about one kilometre; thence southward direction along the Maore-Maweni furrow at a distance of about 1.8. kilometre; hence west-south direction for about 2 kilometres; thence north-westerly direction for about 900 metres to the bridge the point of commencement.

   (58) All that area of land in the Kahe Planning Area covering about 3.44 square kilometres to the north the boundary lies 1½ km from the centre of the Town and runs to where it meets Oria furrow to the East Oria furrow stretches south for about ½ km, to the south it runs parallel to the Taveta railway line at a distance of about 1/2 km and this extends to meet the major Moshi-Same railway line, to the west is bounded by Moshi-Same railway line *.

   (59) Uchira Planning Area boundary *.

   All that area of land covering about 328 square kilometres–

NorthHalf a kilometre Northwards from the middle of Moshi-Arusha highway and extends Eastwards to Kiraia Valley and Westwards to Koresa Valley.
EastFrom Kiraia bridge the boundary extends northwards along the valley for half a kilometre and southwards from the bridge for ½ kilometre.
SouthAs to the north the boundary extends from Kiraia Valley to Koresa Valley to the west.
WestThe boundary is Koresa Valley. From Koresa bridge extends half a kilometre north and half a kilometre south.

   (60) Ndungu Planning Area Boundary. *

   All that area of land covering about 4.65 square kilometres.

NorthFrom the bridge across the Gonja Mkomazi road, the Yangoma river forms the boundary east and westwards.
EastTo the east is the furrow or channel forms the boundary from the Yongoma river southwards to Kalemawe Dam.
SouthThe Kiriya Msanga Valley extending to Kalemawe Dam. Extending westwards past Parane Secondary School.
WestThe boundary here extends along the foot hills of Kazembe hills and extends northwards to meet the Yangoma river.

   (61) All that area of land, in Makanya Planning Area covering about 4.62 square kilometres bounded to the north by a sisal estate, to the east by Tanga-Dar es Salaam road, to the south it stretches from the road Westwards for about 3 kilometre; to the west by a traditional natural tree and extends Northwards to the Sisal Estate *.

   (62) All that area of land at Maili Sita Planning Area covering about 2.81 square kilometres, bounded to the north by Old Moshi-Arusha road extending from Weruweru river, past Lyamungo road eastward for about 11/2 km, to the east extends from the Old Moshi Road southward past Njoro Primary School to the central Hai Headquarters and finally the Moshi-Arusha highway, to the south Moshi-Arusha highway stretching east-westwards to Weruweru river, to the east Weruweru river from the Moshi-Arusha highway it extends Northwards to the Old Moshi-Arusha road *.

   All that area of land in Morogoro Planning Area outlined in registered Plan No. 17380 held by the Director of Urban Planning *.

Note: The effect of this order is to make each of the areas referred to in the schedule a planning area. They are:

   (1) The City of Dar es Salaam.

   (2) The township of Morogoro and a portion of the Morogoro District including certain alienated lands adjacent to the township boundaries.

   (3) The township of Tanga the Tanga Nje (Kiomoni) Minor Settlement, portions of the Tanga Nje (Mwakidila) Minor Settlement and certain alienated lands in Tanga District.

   (4) The township of Mwanza and a portion of Lake Vitoria adjoining the Township boundary.

   (5) The township of Dodoma.

   (6) The township of Korogwe. G.Ns. Nos. 397, 398, 399 and 400 have ceased to have effects Cap. 355 s. 14.

THE TOWN DEVELOPMENT (CONTROL) (APPLICATION) ORDER

(Sections 4, 11 and 20 of the Town Development (Control) Ordinance (Cap. 103) 1)

G.Ns. Nos.
242 of 1937
35 of 1939
36 of 1939
215 of 1943
177 of 1947

   1. This Order may be cited as the Town Development (Control) (Application) Order.

   2. Parts I, II and III of the Town Development (Control) Ordinance * are hereby applied to the townships specified in the Schedule hereto.

SCHEDULE

   Arusha

   Kigoma

   Moshi

   Bagamoyo

   Kilosa

   Pangani

   Bukoba

   Lindi

   Shinyanga

   Chunya

   Lushoto

   Tabora

   Iringa

   Mbeya

THE TOWN AND COUNTRY PLANNING (PLANNING AREAS) ORDER

(Section 13)

G.N. No. 607 of 1994

   1. This Order may be cited as the Town and Country Planning (Planning Areas) Order.

   2. The Areas described in the Schedule to the Order are declared to be planning areas for the purposes of the Town and Country Planning Act.

   3. Detailed Schemes for the Schedule areas shall be prepared and deposited with the Director of Town Planning.

SCHEDULE

   1. Mwanza Municipality.

   Ismailo, Bungando, Butimba, Mkuyuni, Igogo, Kisumba, Mabatini, Nyakato, Kiloleni, Bwiru, Kiseke, Pasiansi, Ilemela, Nyegezi, Igoma, Mbugani, Pambe, Kitangiri, Nyamagana, Sangabuye, Kishiri, Kuchelele, Mkolani, Buhongwa, Buswelu, Mirongo, Bugongwa, Kisesa and Airport area.

   2. Arusha Municipality.

   Levolosi, Elerai, Sinon, Mushono Murriet, Mzimuni, Olasiti, Malangarini and Airport area.

   3. Tanga Municipality.

   Usagara, Makorora, Nguvumali, chumbageni, Kichangani, Mwakidila, Mzingani, Msambweni, Mwenzange, Kiemoni Kirara, Mubokweni, Majani Mapana, Makekeni, Mabawa, Mzizima, Tongoni, Pongwe, Maweni, Duga, Tangasisi, Moranzare, Marungu, and Airport area.

   4. Morogoro Municipality.

   Mji Mpya, Mazimbu, Mwembe Songo, Kichangani, Kingo, Memani, Mbuyuni, Mafigo, Boma, Kiwanja/Ndege, Kihonda, Uwanja wa Taifa, Saba Saba, Sultani Area, Mzinga, Bigwa, Mjimkuu, Kingolwira, Mindu, Tungi, Kilakala and Sokoine University area.

   5. Mbeya Municipality.

   Iyunga, Ruanda, Nzovwe, Mabatini, Sinde, Nonde, Igamilo, Ilombe, Isanga, Sisimba, Uyole, Itezi, Mwamsokwa, Ilemi, Maendeleo, Majengo and Mbalizi road.

   6. Iringa Municipality.

   Kihesa, Mtwivila, Gangilonga, Wilolesi, Kitanzini, Ruaha, Mshindo, Mivinjeni, Mlandege, Mwangata, Kwa Kilosa, Makorongoni, Ilala, Mkwawa and Airport Area.

   7. Moshi Municipality.

   Jonguo, Karanga, Msaranga, Kiborloni, Kilimanjaro, Njoro, Mji Mpya, Mawenzi, Kaloleni, Bondeni, Rau, Korongoni, Pasua, Kiusa, Sambarai, Kiharara, Mdawi, Shirimatunda and Airport area.

   8. Tabora Municipality.

   Mbungani, Kanyeye, Ngambo, Kitete, Malolo, Ipuli Mtendeni, Gongoni, Isevya, Kiloleni, Tambukareli, Chem Chem, and Airport Area.

   9. Bukoba Township.

   Namgembe, Kashai, Mafumbo, Kahororo, Miembeni, Bilele, Buhone, Nshambya, Buhombe, Ijuganyondo, Kitendafuro, Kibeta, Nyanga, Kagondo and Airport area.

   10. Mtwara Township.

   Majengo, Chikongola, Likembe, Railways, Shangani, Vigeni, Jangwani, Kisungule, Mitengo, Mtonye, Ufukoni, Magengeni, Mikindani, Cluno and Airport area.

   11. Lindi Township.

   Nsabura, Raha Leo, Mitandi, Mikumbi, Makonde, Ndoro, Msinjahili, Nachingwea, Wailes, Matopeni, Mwenge, Mtande, Mitwera, Kiwengewe, Tulieni, Kitunda, Kwela and Airport Area.

   12. Singida Township.

   Kindai, Mitunduruni, Mtipa, Mughanga, Ipemea, Utemini, Mandewa, Unyambwa, Onyomibumbi, Mungumaji, Mwankoko, Mtamaa and Majengo.

   13. Kigoma Township.

   Sangwe, Mwanga, Kusini, Mwanga Kaskazini, Gungu, Buhando, Businde, Rusimbi, Kitengoni, Kasimbu, Kasingirima, Machinjoni, Majengo, Rubuga, Kagera, Kibirizi and Airport area.

   14. Shinyanga Township.

   Kambazage, Ngokolo, Chamaguha, Ibinzamata, Kisumbi Chibe, Ibadakuli, Kitangili, Mwawaza, Ndala, Mwamalili and Kolandoto.

   15. Sumbawanga Township.

   Bangwe, Jangwani, Malangali, Chanji, Old Sumbawanga, Mazwi, Izia, Katandala, Kizwite and Airport area.

This section of the article is only available for our subscribers. Please click here to subscribe to a subscription plan to view this part of the article.